News 20

23 Jun 2020 | BY Chris Bramhall

CDS Airtek – Designed and built a reactor furnace & a pre-heat furnace. Limited space and high tech demands required a design using special linings and heating elements that could be changed during use. The reactor furnace was operated for extended time periods, without failure.